The final 2 ships in the 09/10 ship building plan have been completed to schedule. P142 Caracara is the latyest Falcon 47A patrol ship and A161 Heptane the latest Extender 73A oiler. A new Coril 86B shuttle A582 Horsehead has also been completed.
Isometric 41A frigates F111 Pleistocene and F114 Palaeozoic have completed their ILU and been replaced on the production jig by F112 Holocene and F117 Proterzoic.
The first ship of the 10/11 ship building plan is already undertaking trials following an early completion by the Raegris. This is F171 Freedom of the new Freedom 41B frigate class. It is not expected to enter service for a couple of months however as it is undertaking the extended trials period typical of a first-of-class.