Relations with the HCS are good enough though for a final SPECNES update to have been agreed in a 13 million zark contract signed last week. All Pentekonter-Ms will receive the updated SPECNES system this Summer during natural cycle refits.
The other half of the DDS minesweeping system Pave Yellow is also to be replaced by a Raegris designed system. Pave Yellow 2.0 is expected within the next couple of years (DMS is compatible with the existing PY). PY 2.0 will be smaller and will be fitted to Romes/Berlins as a combat module thus releasing the 3 Isometrics fitted with Pave Yellow to normal duties.