- The final 2 ships of SBP 2113/4 have been completed. Both are transports, the Provider 71A A119 Crane and the Friendship 75A A210U Association.
- The Terran Sea ILU is nearly completed, the last 2 Barents Sea 43B ships have been converted the Mediterranean Sea 43G standard, M181 Andaman Sea and M182 Flores Sea.