3.4.24

NS Black Triangle begins testing

The first NS built Black Triangle 126A has begun testing, though not fitted with the new Lepton WX-01 engine (it is thought it is fitted with the same MBO developed engine as the MBO Black Triangle variant). The NS ship is also not fully equipped with the intended final weapon and sensor fit as these are also under development.

Initial testing will take place this summer before the ship is due to receive it's proper engine and full tactical system in the autumn. NS say the ship is intended to enter service by the end of 2125.