22.3.20

NS strained by holding two exercises at once

Over the last week NS has held two exercises at the same time, Ground Shock 2020 and Extra 2020-A. President Windscorpion's idea behind this being to see how NS copes with being put under strain and responding to different threats at the same time.

Although the fleet's resources were stretched by the two exercises and normal operations all missions were accomplished though one ship is reported to have had to delay entering maintenance for a week to cover a patrol circuit. The President is said to be pleased by how NS performed.