1.3.18

Fleet News (01/03/18)

The final three outstanding ships in the 2117/18 Ship Building Plan have been competed. The first is the latest Kinetic 035-309 Kando.

Its joined by the latest Extender 073-128 Reservoir, possibly the last Extender 73A to be built though the fleet may be continually topped up for strategic reasons (one has been added to the next ship building plan though hasn't officially been ordered yet).

Finally the third Navelwort 86M special forces transport (allegedly) is 086-203 Nasturtium.