14.6.23

Sirikwan order new ships

Thought to be part of the upcoming DTA-CSE economic deal, Sirikwan has placed an order for Clone built ships. Sirikwan has chosen the Shark destroyer to replace it's six Helwins which are due to leave service in 2128. Eight Shark SKH-E2s have been ordered. This model has a number of upgrades over Sirikwan's existing fleet of Sharks which will also be upgraded as part of the deal. The details of the upgrades has not been reported.

Sirikwan's fleet of ex-Clone Nerval transports will be replaced by five Loader (Type C)s from next year. The total value of the contract has not been disclosed.