31.3.15

Remedians delay withdrawal of Perimpaz until 2116

The Remedians have delayed the withdrawal of their final 3 Perimpaz 39As until 2116 after the problems with the replacement Corkscrew 51As. One of the withdrawn Perimpaz has also had its final power shut down delayed and the ship kept able to be reactivated within a month "just in case".

The Argon war means that many DDS ships have been redeployed to DDS South leaving little available to cover for the Remedians if problems with the new ships continue. A new rectifier is now being trailed on a DDS Corkscrew and a team is investigating the databus problems, one report says the problem could be a manufacturing defect and thus should be fixable.